Consider the following project information:

Activity Precedence Duration
A                              10
B              A               6
C              A             18
D             B              15
E             C                8

What is the critical path for completion of the project?

 

  A-B-D
  A-C-E
  A-B-C-E
  B-C-D-E

 

[SCROLL DOWN TO SEE THE ANSWER]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The correct answer is the second option.

Explanation.

Option 2 is correct because the duration of the path A-C-E is 36 and is the longest and is therefore the critical path.

 